Pooling expertise and experience for our clients

We focus on quality and continuity – as this is what our clients appreciate

Good development planning requires airport-specific knowledge of planning methods and standards. A detailed understanding of operational and functional demands is essential.

And it requires insight into businesses and regional economic contexts, something we have been doing for years. Since 2011 we have been investing this combined expertise in the success of planeground.

ABZKarte

Aberdeen, GB

 

Airport Development Consulting and Management Support

Client
Aberdeen International
Airport
Project time
08/2012 – 08/2012

Task

Consultancy services and management decision support to alleviate airside capacity constraints as well as concepts for short-term terminal expansion and quick-win improvements.

AMSKarte

Amsterdam, NL

 

Integrated Design Terminal Area – A Schiphol

Client
Schiphol Nederland BV
Project time
09/2017 – ongoing

Task

Part of 1st prize winning consortium for the EU tender for integrated terminal design of new Amsterdam Airport Schiphol. Terminal master planning (ultimate stage concept), Functional planning for first phase developments, PAX-flow and user requirement analysis including simulations, Airside / landside interface planning coordination


Partner

Kaan Architecten, Estudio Lamela, Ineco, ABT, Arnout Meijer Studio, DGMR

 

Passenger terminal development

Client
Schiphol Nederland BV
Project time
07/2011 – 12/2011

Task

Study of future passenger terminal development principles with the aim of optimizing usability, flexibility and overall efficiency of the terminal assets.


Partner

SCAI

BIXKarte

Bintan, Indonesia

 

Bintan Aerospace Park: Long-Term Vision

Client
Gallant Venture
Project time
08/2015 – 01/2016

Task

Development study for airport master plan and adjacent aerospace industry park developments including concept design for first phase passenger terminal building. Preparation and illustration of a viable concept for the Aerospace Park including its commercial / urban zones.

BOMKarte

Bombay, India

 

Design Consultancy for Navi Mumbai Intl Airport

Project time
12/2017 – 03/2018

CGNKarte

Cologne/Bonn, GER

 

Master Plan 2045

Client
Flughafen Köln/Bonn
GmbH
Project time
04/2018 – ongoing

Task

Master Plan for Cologne/Bonn Airport for long-term vision 2045


Partner

ASTOC Architects and Planners GmbH, Intraplan Consult GmbH

 

Several

Client
Flughafen Köln/Bonn
GmbH
Project time
2015 – ongoing

Task

Planning of terminal adaptations to accommodate new Eurowing long-haul, low-cost product at CGN including comprehensive terminal / apron capacity and airline requirement analysis.


Partner

ASTOC Architects and Planner

 

Land Use Plan 2035

Client
Flughafen Köln/Bonn
GmbH
Project time
06/2017 – 12/2017

Task

Land use study of existing situation and definition of development scenarios for 2030/2035 with functional requirements based on forecasted area demand.


Partner

ASTOC Architects and Planner

 

Hub Development

Client
Curaçao Airport
Holding N.V.
Project time
12/2017 – 04/2018

Task

Development of hub scenario with derivation of airside infrastructure requirements

 

Re-assessment of Airport City Development Options for CAH

Client
Curaçao Airport
Holding N.V.
Project time
07/2017 – 07/2017

Task

Examination of the existing “old” Airport City Masterplan including improvment of “list of possible development ideas” by reflecting on the contextual situation at CAH and providing an estimation on its realizability

CWLKarte

Cardiff, UK

 

Apron Planning Study

Client
Cardiff Airport
Project time
01/2018 – 03/2018

Task

Elaboration of concepts for ICAO Code E aircraft positioning incl. simulations of bridge connections / taxiing resp. push-back procedures and detailed marking execution drawings

FRA Karte

Frankfurt, GER

 

DLH Location Catalog & Plan FRA 20xx

Client
Deutsche Lufthansa AG
Project time
09/2017 – 03/2018

Task

Consultancy and support services to collect

 

Airport / Terminal Development Plan

Client
Fraport AG
Project time
07/2015 – 03/2016

Task

Consultancy and planning support to the central infrastructure department (master planning) to define new guidelines for airport and terminal development planning FRA 2030+.

 

Terminal 2 - DLH User Requirements

Client
Deutsche Lufthansa AG
Project time
02/2015 – 05/2015

Task

Consultancy services to set out development strategy for Terminal 2 at FRA. Definition of user requirements to meet Lufthansa / STAR Hub demands from 2021.

 

LH-Master Plan FRA

Client
Deutsche Lufthansa AG
Project time
01/2011 – 04/2013

Task

Lufthansa location master plan FRA 20xx – long-term perspective for the Frankfurt hub with regard to group property


Partner

AS+P Albert Speer & Partner GmbH

 

Passenger Transfer Study - Improvements to Infrastructure Flows and Processes in T1 and T2

Client
Fraport AG
Project time
06/2011 – 11/2011

Task

Terminal study to improve transfer passenger flows and processes in Terminal 1 and 2.


Partner

AS+P Albert Speer & Partner GmbH

HELKarte

Helsinki-Vantaa, FI

 

Second Opinion Study on Master Plan 2035

Client
Finavia Corporation
Project time
09/2012 – 12/2012

Task

Second opinion study on Helsinki Master Plan 2035, Land Use Plan and Terminal Development Concept 2025 including assessment of airport development strategy to ensure interim capacity

LUXKarte

Luxembourg, Luxembourg

 

GIS Development Program

Client
lux-Airport
Project time
04/2018 – ongoing

Task

Development and execution of GIS implemention programm.


Partner

lat/lon

 

Airside Planning

Client
lux-Airport
Project time
2015 – ongoing

Task

Continuous consultancy services for conceptual airside planning works with focus on apron configuration


Partner

project:airport

 

Terminal and Airport Planning

Client
lux-Airport
Project time
2014 – ongoing

Task

Continuous consultancy services for terminal and airport development: optimization of terminal processors configuration, activation of Terminal B and other infrastructure elements

 

EASA Aerodrome Certification Consultancy

Client
lux-Airport
Project time
02/2017 – 12/2017

Task

EASA Aerodrome Rules 139/2014 Certification and Audit Support including compliance checks, safety assessments, stakeholder management, development of operational manuals

 

Terminal Capacity Study

Client
lux-Airport
Project time
11/2016 – 02/2017

Task

Analysis of future terminal capacity including PAX flow, gate demand and position demand analysis.

 

Retail

Client
lux-Airport
Project time
05/2014 - 01/2015

Task

Concept planning for retail and non-aviation business enhancement in the terminal at LUX.


Partner

the store designers

MUCKarte

München, Germany

 

Extension of Terminal 1 - T1E

Client
Flughafen München
GmbH
Project time
01/2016 – 11/2018

Task

1st prize winning consortium for EU tender for extension of Terminal 1. Participation in planning phases 1-3 including functional planning / conceptual design for new terminal, validation of qualitative and quantitative requirements, assessment of planning objectives in relation to over-all Terminal development strategy


Partner

sop architekten GmbH, JSK architekci Sp.z.o.o, Schüßler-Plan Ingenieurgesellschaft mbH, SSF Ingenieure AG, Planeground airport consulting

PNH/REPKarte

Phnom-Penh / Siem Rep, Cambodia

 

Signage

Client
Cambodia Airports
Authorities
Project time
09/2015 – 02/2016

Task

Comprehensive signage strategy for the airport landside.

 

Terminal Capacity Analysis

Client
Vilnius Airports
Project time
09/2017 – 11/2017

Task

Terminal capacity analysis & conceptual design of 2020/2025 (7MAP) adaptations (including interim measures)


Partner

leit-werk ltd, Reitsema & partners architects BNA